Sunday, August 1, 2010

Brain Tumor Develop From Nerv

sprint or Endschleichen - that is the question!

This week was finally back more life on the site : Heico Wendt and building services were on site, as well as company Kück, which has made interior doors and baseboards. And besides, finally our photovoltaic system on the roof! Thus we had expected at all any more. : P We had been to install ie can not name a precise date. "They come when they can manage it, but in any case before the provisional acceptance." We then that Thursday but should finally get our meter by E. ON Westfalen Weser, it was then but about time . Lo and behold, on Wednesday, they arrived, the 1.1 kWp sweetie. ;)



With E. ON, we had this week again fun. First, we received a cryptic letter with any count and a "thank you for your order. Big question mark, so call again there. This was the order confirmation for our site electricity. The day before we no longer need them. That was fast. : P

On Thursday Paddy was for 11.00 clock by Heico building services have been appointed to the house , we should then be connected to the mains. Thus, the PV is connected, we prove that it has registered with the Federal Network Agency. For this purpose it is sufficient to send the fax report and this should Paddy submit to this date the E. ON. Paddy goes so from work through to that date, only to find the spot that the date has shifted to 13 clock . It would also be missing some part, to take the PV into operation and could procure any more. It would also have been too many demands, telling them in a brief telephone call, because you drive like yes away from the office and drops his accumulated hours for nothing go whistle! And an exact date for the commissioning of the photovoltaic we still do not know because E. ON advance so then again, I must. And if the missing part is present now, we are also unknown. At least the

Sunny Boy depends now in place in the utility room and makes our "technology corner" a little more crowded.


And "the rest" has been connected to the electricity, which can be unmistakably identified by these examples.



The upper Image shows the lights of the light switch in our attic lighting (so we have not accidentally turned on the light up there, without realizing it). And yes, we have umpteen times leave the blinds up and take-down. :) It's so nice to finally have electricity! However, in some crashes shutters still neatly in the rafters, that is, they do not go down smoothly, ie here have adjusted yet.

And here also our adorable electric meter, three in number (budget, heat pump, photovoltaic).


Apart the Somfy blinds switches that are used in floor and guest WC and utility room to use, but so far we could yet at no additional switches or outlets enjoy . Especially since the Siemens switches and sockets, we have everywhere else in anthracite, look much nicer. Too bad.

Also in "plumbing" it continued. In the guest bathroom installed toilet (SUNBERY of V & B) and sink (SUBWAY V & B), including fitting (linear Grohe).


into the shower and had also done something However, the installation is not finished because the shower set is still missing.


In bathroom upstairs, we could admire the sink faucets (CULT of V & B).


They fit really great to sink. We have chosen well. ;)

Again, the installation in the shower is only half completed. The hand mixer (€ Style by Grohe) is attached ...


... but the shower set is still missing, ie, only the hole for flush mounting is already visible.


comes to this hole, nor our rain shower (Grohe Rainshower Modern).


The WC (MEMENTO, V & B) is now also in place in the left alcove of the T-wall.


We have also tested the same soft-closing function. ;)


popping the lid is now excluded.

And our towel is also in place.


Unfortunately, unfortunately, is missing but still our bath fittings. * Grumble *

Actually, we were on Friday evening a little surprised. Our schedule was for this that is Thursday and Friday "final installation electrical and plumbing" for Friday and "heating system control. On Friday, however, was ever no one of Wendt and Heico site, at least we could not detect any difference from last week. Pending a preliminary takeover next Thursday but now they have three days left, we still find the a little weird, because you are not usually could always count on the schedule . The guys from Wendt had not even look at the energy, the drawer of our vanity cabinet install again after they had installed the fittings ...

and annoying this condition is also, as we meet the end more sneak as fast to go . Our outdoor module is indeed now been unpacked, but is still in the living room.


In the guest bathroom is missing the radiator. Most switches and electrical outlets are missing, and the spots in the shower and the toilet. Also we had a month ago Heico building services contracted to put the power connector for the control of our waste water pump . This is missing to this day, although long since paid for by us! This is more than just annoying, because the sewage pump is of course still could not be connected and still no sample purge is done.

Rinas boss has a nice phrase for this state, he calls this "limited optimism" . And quite honestly, just the feeling at the moment for us. We are curious to see what next week pending a preliminary takeover happened yet ... and we are really happy that our site manager is starting next week again!

The end of the week, but then we still sweetened company Kück, as , our interior doors and baseboards installed even ahead of schedule. These were in fact only for next week on the plan. And what can we do? We are again excited and it's amazing how much comfort doors create ! Not just by a new sound - it's not as reverberant - but only visually.

On the main floor left the door to guest WC and utility room and the glass door to the living room.



On the top floor overlooking the doors of rooms (left) and study.


The doors are all of Prüm (wood doors: RY-251 model, glass door model RY-151-1).

As we left one laminate patterns for floor and first floor there are the door frame is conveniently placed been installed so that we can push the laminate by this , not every door frames have additional cutting.

This is our laminate for the living / dining room and kitchen.


The sound is called Zebrano. The same wood tone we have in the kitchen (side panels and worktop).

This laminate comes in here all the rooms and the hallway upstairs used. Apart from the bathroom of course. ;)


As can be seen with more moderate structure. Is a kind of medium dark Nussbaumton.

By the way we are very amused that in our schedule for next Wednesday and Thursday "floor coverings" is. Yes, we make the 130 m² area just once in 2 days. ;))

In Garden has otherwise done anything because we are still waiting for the subsequent delivery of the paving stones. It now only cavort around the terrace already basalt stones for the missing edge .


time apart from the remaining "minor" things that still need to be done next week, still waiting for next week in the truest sense of the word big highlight for us: our stairs! This will take place on Wednesday the way to us. We are very excited and anticipation. ;)

Just before the pre-acceptance has reached us, of course, even the last bill of Viebrock . In the accompanying letter, by the way again explicitly pointed out that "Connection details for external facilities" must be followed (keyword drainage). Good that we have already sorted it. ;)

Also on attic something interesting, that letter: "As a precaution we have ever been on the Winter out. The non-developed loft building physics is to describe as a cold roof space. The possibility of air driving in snow is to "open" structures (prev and exhaust air openings, overlapping webs of the lower deck) is not 100% ig excluded for all time. Driving snow-unit input is also just about perfect (rare) individual case. Please check the ground when it's snowing. If snow occurs, please remove. "

How good that we have no" cold roof space "have and we are looking beautiful and is lined with insulated plasterboard. Not because of the very rare individual case, but because "cold roof space" somehow sounds very uncomfortable and not really seem to fit the Energy Efficiency House. Yes, alright, everything's tight, so will hopefully be conclusively proved by the blower door test, but purely from the feeling does not that sound just so good. Therefore, we are with our invested in the attic Euros more than satisfied.